Important pages are About Us, Services and Gallery. The blog of Jmsproject.com.au can be found at: http://www.jmsproject.com.au/blog/. - Visit the blog page
In the following table you'll find the 10 most important pages of Jmsproject.com.au:
# | Description | URL of the website |
---|---|---|
1. | About Us | /about-us/ |
2. | Services | /services/ |
3. | Gallery | /gallery/ |
4. | Blog | /blog/ |
5. | Contact Us | /contact-us/ |
6. | Portal | /portal/ |
7. | Drones used to inspect Strata Buildings | /drones-used-to-inspect-strata-buildings/ |
8. | Strata Building Defects Feature Articles | /strata-building-defects-feature-articles/ |
9. | The Building Manager | /the-building-manager-2/ |
10. | Project Managers Vs Caretakers | /project-managers-vs-caretakers/ |
Information about Jmsproject.com.au on Wikipedia the free encyclopedia: Requirements management is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. read more
A Apache server hosts the websites of Jmsproject.com.au. For managing the data of the webpages the CMS WordPress in the version 6.2.2 is used. The website uses the latest markup standard HTML 5.
IP address: | 108.167.143.132 |
Server provider: | UNIFIEDLAYER-AS-1 |
Number of websites: | 17 - more websites using this IP address |
Best-known websites: | Jctvpak.tv (little known), Lostriverrealestate.com (little known), Tabletweavers.org (little known) |
Language distribution: | 59% of the websites are english |
Webserver software: | Apache |
Cms-Software: | WordPress, Version 6.2.2 |
Load time: | 2.94 seconds (slower than 99 % of all websites) |
HTML version: | HTML 5 |
Robot information: | max-image-preview:large |
Filesize: | 288 KB (1420 recognized words in text) |
The website doesn't contain questionable content. It can be used by kids and is safe for work.
Attribute | Classification | |
---|---|---|
Google Safebrowsing |
Safe | |
Safe for children |
||
Safe for work |
||
Webwiki rating |
No ratings | |
Server location |
USA | |
Trustworthy 85% |